Edit

Parts Production

ATS Chem

Efficient Tank Fabrication
Begins With Planning

The parts and materials preparation process are the key to any project execution because it sets the stage for efficient production throughout every stage of fabrication and assembly.

Careful planning, thorough individual parts preparation, and detailed inventory management during this phase prevent production delays that can otherwise extend project delivery shedules.

Supported fabrication steps may range from main tank and pressure vessel components to such add-on elements as piping, ladders and platforms. Parts needed for any integral fabrication such as internal piping are also prepared during this phase so as to minimize the production timeline.

  • Comprehensive in-house Parts Production
  • Fabricating Area of 25,000 Sq.ft
  • Plasma cutting machine upto 45mm Thk
  • CNC Plasma cutting machine upto 30mm Thk
  • Plate Rolling Machine upto 25mm Thk & Width 2.5m
  • Pipe Rolling Machine From 15NB to 100NB
  • Material in Carbon Steel like SA 516 Gr 70,Gr 60, IS 2062 Gr B, E250, A36, Hardox 400,500, 16 MO3, SA 387 Gr 11,
  • Material in Stainless Steel like SS304,304L,316,316L,30815,310,SS321,SS409,SS410,SS202 etc..